{"id":1005964,"date":"2024-09-18T17:03:36","date_gmt":"2024-09-18T20:03:36","guid":{"rendered":"https:\/\/novosite.psr-inc.com\/noticia\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/"},"modified":"2024-09-18T17:11:18","modified_gmt":"2024-09-18T20:11:18","slug":"curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years","status":"publish","type":"noticia","link":"https:\/\/www.psr-inc.com\/en\/news\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/","title":{"rendered":"Curtailment will continue to be an issue that generators will want to pay attention to in the coming years"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">A word increasingly present in the vocabulary of the electricity sector, curtailment is the interruption of energy generation at a plant for reasons unrelated to the project and by order of the National Electric System Operator (ONS). The phenomenon, which directly impacts the production and revenue of the generating company, occurs for two reasons: excess supply of electricity at certain times of the day and restrictions in the transmission system.<\/p>\n<p>Even with the forecast of the construction of important transmission lines auctioned in recent years, PSR projections indicate that curtailment will be frequent as long as the energy supply continues to grow at a faster rate than demand in the country. \u201cIn 2024, for example, the oversupply of energy could reach 25%, with an average supply of around 100 GW for an average demand of 80 GW, forcing the operator to cut energy generation,\u201d &#8211; says Jairo Terra, head of Regulation and Litigation at PSR.<\/p>\n<p>Curtailment has different dynamics and impacts for different sources. In the case of intermittent renewable sources, such as wind and solar plants, the measure has a direct commercial consequence for the agents, since the cut impacts the fulfillment of the contracts of the projects and the economic viability of the projects. For hydroelectric plants, the effect is shared among the agents of the same type, since the cut has an impact on the energy reallocation mechanism (MRE), reducing the total energy to be shared by it.<\/p>\n<p>Thus, the frequency and intensity of curtailment have had repercussions on the operational and financial results of energy generators in the country and, consequently, led to lawsuits in court or in arbitration chambers.<\/p>\n<p>With 36 years of experience, PSR has been focusing on the subject, working with several players and institutions. PSR is recognized for its technical, regulatory and simulation capacity on the subject, based on a portfolio of state-of-the-art analytical tools. The PSR team develops regulatory studies, risk assessments and financial impacts on general and custom curtailment.<\/p>\n<p>Learn more <a href=\"https:\/\/ac-landing-pages-user-uploads-production.s3.amazonaws.com\/0000144634\/2c677ff3-2fb6-4d0a-89e8-22b9319df4b6.png\">here<\/a>.<\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A word increasingly present in the vocabulary of the electricity sector, curtailment is the interruption of energy generation at a plant for reasons unrelated to the project and by order of the National Electric System Operator (ONS). The phenomenon, which directly impacts the production and revenue of the generating company, occurs for two reasons: excess&#8230;<\/p>\n","protected":false},"author":1,"featured_media":999255,"template":"","meta":{"_acf_changed":false},"categories":[],"class_list":["post-1005964","noticia","type-noticia","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>News<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.psr-inc.com\/en\/news\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"News\" \/>\n<meta property=\"og:description\" content=\"A word increasingly present in the vocabulary of the electricity sector, curtailment is the interruption of energy generation at a plant for reasons unrelated to the project and by order of the National Electric System Operator (ONS). The phenomenon, which directly impacts the production and revenue of the generating company, occurs for two reasons: excess...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.psr-inc.com\/en\/news\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/\" \/>\n<meta property=\"og:site_name\" content=\"PSR Energy\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/psrenergy\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-18T20:11:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.psr-inc.com\/wp-content\/uploads\/2025\/08\/header-sitenovo-psr-Curtailment-port.png\" \/>\n\t<meta property=\"og:image:width\" content=\"941\" \/>\n\t<meta property=\"og:image:height\" content=\"681\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@psrenergy\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/news\\\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\\\/\",\"url\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/news\\\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\\\/\",\"name\":\"News\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/news\\\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/news\\\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.psr-inc.com\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/header-sitenovo-psr-Curtailment-port.png\",\"datePublished\":\"2024-09-18T20:03:36+00:00\",\"dateModified\":\"2024-09-18T20:11:18+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/news\\\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/news\\\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/news\\\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.psr-inc.com\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/header-sitenovo-psr-Curtailment-port.png\",\"contentUrl\":\"https:\\\/\\\/www.psr-inc.com\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/header-sitenovo-psr-Curtailment-port.png\",\"width\":941,\"height\":681},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/news\\\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Not\u00edcias\",\"item\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/noticias-antigo\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Curtailment will continue to be an issue that generators will want to pay attention to in the coming years\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/\",\"name\":\"PSR\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/#organization\"},\"alternateName\":\"PSR Energy Consulting\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/#organization\",\"name\":\"PSR\",\"alternateName\":\"PSR Energy Consulting\",\"url\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.psr-inc.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/logo-psr.svg\",\"contentUrl\":\"https:\\\/\\\/www.psr-inc.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/logo-psr.svg\",\"width\":1056,\"height\":816,\"caption\":\"PSR\"},\"image\":{\"@id\":\"https:\\\/\\\/www.psr-inc.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/psrenergy\",\"https:\\\/\\\/x.com\\\/psrenergy\",\"https:\\\/\\\/www.instagram.com\\\/psrenergy\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/psrenergy\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"News","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.psr-inc.com\/en\/news\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/","og_locale":"en_US","og_type":"article","og_title":"News","og_description":"A word increasingly present in the vocabulary of the electricity sector, curtailment is the interruption of energy generation at a plant for reasons unrelated to the project and by order of the National Electric System Operator (ONS). The phenomenon, which directly impacts the production and revenue of the generating company, occurs for two reasons: excess...","og_url":"https:\/\/www.psr-inc.com\/en\/news\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/","og_site_name":"PSR Energy","article_publisher":"https:\/\/www.facebook.com\/psrenergy","article_modified_time":"2024-09-18T20:11:18+00:00","og_image":[{"width":941,"height":681,"url":"https:\/\/www.psr-inc.com\/wp-content\/uploads\/2025\/08\/header-sitenovo-psr-Curtailment-port.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_site":"@psrenergy","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.psr-inc.com\/en\/news\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/","url":"https:\/\/www.psr-inc.com\/en\/news\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/","name":"News","isPartOf":{"@id":"https:\/\/www.psr-inc.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.psr-inc.com\/en\/news\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/#primaryimage"},"image":{"@id":"https:\/\/www.psr-inc.com\/en\/news\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/#primaryimage"},"thumbnailUrl":"https:\/\/www.psr-inc.com\/wp-content\/uploads\/2025\/08\/header-sitenovo-psr-Curtailment-port.png","datePublished":"2024-09-18T20:03:36+00:00","dateModified":"2024-09-18T20:11:18+00:00","breadcrumb":{"@id":"https:\/\/www.psr-inc.com\/en\/news\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.psr-inc.com\/en\/news\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.psr-inc.com\/en\/news\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/#primaryimage","url":"https:\/\/www.psr-inc.com\/wp-content\/uploads\/2025\/08\/header-sitenovo-psr-Curtailment-port.png","contentUrl":"https:\/\/www.psr-inc.com\/wp-content\/uploads\/2025\/08\/header-sitenovo-psr-Curtailment-port.png","width":941,"height":681},{"@type":"BreadcrumbList","@id":"https:\/\/www.psr-inc.com\/en\/news\/curtailment-will-continue-to-be-an-issue-that-generators-will-want-to-pay-attention-to-in-the-coming-years\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.psr-inc.com\/en\/"},{"@type":"ListItem","position":2,"name":"Not\u00edcias","item":"https:\/\/www.psr-inc.com\/en\/noticias-antigo\/"},{"@type":"ListItem","position":3,"name":"Curtailment will continue to be an issue that generators will want to pay attention to in the coming years"}]},{"@type":"WebSite","@id":"https:\/\/www.psr-inc.com\/en\/#website","url":"https:\/\/www.psr-inc.com\/en\/","name":"PSR","description":"","publisher":{"@id":"https:\/\/www.psr-inc.com\/en\/#organization"},"alternateName":"PSR Energy Consulting","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.psr-inc.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.psr-inc.com\/en\/#organization","name":"PSR","alternateName":"PSR Energy Consulting","url":"https:\/\/www.psr-inc.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.psr-inc.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.psr-inc.com\/wp-content\/uploads\/2023\/03\/logo-psr.svg","contentUrl":"https:\/\/www.psr-inc.com\/wp-content\/uploads\/2023\/03\/logo-psr.svg","width":1056,"height":816,"caption":"PSR"},"image":{"@id":"https:\/\/www.psr-inc.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/psrenergy","https:\/\/x.com\/psrenergy","https:\/\/www.instagram.com\/psrenergy\/","https:\/\/www.linkedin.com\/company\/psrenergy\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.psr-inc.com\/en\/wp-json\/wp\/v2\/noticia\/1005964","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.psr-inc.com\/en\/wp-json\/wp\/v2\/noticia"}],"about":[{"href":"https:\/\/www.psr-inc.com\/en\/wp-json\/wp\/v2\/types\/noticia"}],"author":[{"embeddable":true,"href":"https:\/\/www.psr-inc.com\/en\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/www.psr-inc.com\/en\/wp-json\/wp\/v2\/noticia\/1005964\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.psr-inc.com\/en\/wp-json\/wp\/v2\/media\/999255"}],"wp:attachment":[{"href":"https:\/\/www.psr-inc.com\/en\/wp-json\/wp\/v2\/media?parent=1005964"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.psr-inc.com\/en\/wp-json\/wp\/v2\/categories?post=1005964"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}